TinaHydrogen
Project
Delivering Reliable Products and Integrated  Hydrogen Solutions Worldwide
  • Project time:
    2026.07.01
  • Location:
    LIAOYUAN · CHINA
  • Project Information:
    1000Nm³/h Alkaline Electrolyzer × 16 4000Nm³/h Gas-liquid Separation System × 4 8000Nm³/h Purification and Drying System × 2
A Polysilicon Manufacturing Base
  • Project time:
    2023.10.09
  • Location:
    China · Yichang
  • Project Information:
    1000Nm³/h Alkaline Electrolyzer 1000Nm³/h Gas-liquid Separation System 1000Nm³/h Purification and Drying System
Shaanxi Hydrogen Energy Industrial Park
  • Project time:
    2025.02.01
  • Location:
    YULIN · CHINA
  • Project Information:
    Model: 1000Nm³/h Alkaline Electrolyzer 1000Nm³/h Gas-liquid Separation System
IIntegrated Hydrogen Production and  Refueling Station
  • Project time:
    2025.12.01
  • Location:
    PORTUGAL · EUROPE
  • Project Information:
    100Nm³/h Alkaline Electrolyzer 100Nm³/h Gas-liquid Separation & Purification Drying System, HRS Equiment
IIntegrated Hydrogen Production and  Refueling Station
  • Project time:
    2026.03.01
  • Location:
    APAC · SOUTH KOREA
  • Project Information:
    200Nm³/h Alkaline Electrolyzer 200Nm³/h Gas-liquid Separation & Purification Drying System,Power Supply and Auxiliary Equipment (including Utilities)
11 pages
/